We make use of cookies to enhance browsing experience and provide additional functionality. To learn more about the different cookies we're using, check out our Privacy Policy please.
Accept Cookies
YOUR SUPPLIER VERIFICATION REPORT
Know what gets checked.
A practical checklist for your on-site supplier verification visit.
Report delivery: within 2 business days after the visit.
Agree the final checklist before the visit. For each item, record the finding, evidence reference, verification status, risk priority and recommended follow-up. Mark anything outside the agreed scope as not applicable.
01 / Business identity
Know who you are dealing with.
Chinese and English legal names; unified social credit code
Business license, registration status and stated business scope
Manufacturer, trading company or mixed business model
Ownership/contact details and disclosed subcontracting arrangements
02 / Site & facilities
See the operation behind the listing.
Visit date, site address, host and areas accessed
Entrance, signage, exterior and production-floor photographs
Site layout, production areas and warehouse condition
Machinery list, visible operating condition and maintenance records
Staff number
Note: Photos are not available for restricted areas.
03 / Quality practices
Understand how quality is managed.
QC responsibilities and documented inspection procedures
Incoming materials, in-process and final inspection records
Measuring equipment and available calibration records
Defect handling, rework and corrective-action examples
Batch identification, traceability and sample retention
04 / Documents & certificates
Separate evidence from claims.
Certificate holder, issuing body, scope and expiry dates
Available issuer verification and consistency with the visited entity
Relevant test reports and product/model coverage
Export arrangements and trade records, where shared
Unverified claims, missing records and follow-up requests
05 / Storage & order readiness
Look beyond the production line.
Raw-material and finished-goods identification
Storage conditions, segregation and inventory practices
Packaging, labeling and order-picking arrangements
Subcontracted processes and supplier controls
Buyer-specific packaging or fulfillment requirements
06 / Safety & working conditions
Record visible concerns.
Visible emergency exits, access routes and fire equipment
Housekeeping, protective equipment and machine safeguards
Visible waste handling and environmental concerns
Basic workforce information provided by management
Concerns requiring a specialist social or environmental audit
07 / Findings & next steps
Turn the visit into a decision.
Executive summary and scope actually completed
Findings linked to photos, documents or interview notes
Status for each item: verified, concern, not verified or not applicable
Risk priority, supplier response and recommended follow-up
Open questions, access limitations and suggested next action
Evidence status
Verified: supported by the evidence recorded. Concern: an inconsistency or issue needs attention. Not verified: evidence was unavailable or insufficient. Not applicable: outside the site's activities or agreed scope.
Report cover & controls
Include report ID, client name, supplier legal name, visited address, visit date, visitor/reviewer names, agreed scope, evidence index and issue date. Distinguish direct observations, document checks and supplier statements. Record high / medium / low priorities with reasons, an action owner and a proposed follow-up date.
Scope limits
This visit is a snapshot of available evidence. It does not certify compliance, guarantee future performance or replace product testing, shipment inspection, a financial investigation or a specialist social/environmental audit.